VCP-DCV (2V0-21.23) Study Plan¶
8-Week Comprehensive Study Schedule¶
This plan assumes 1.5-2 hours of study per day plus 30-60 minutes of hands-on lab work. If you have less time, stretch to 12 weeks. If you are already a working VMware admin, compress to 4-6 weeks and double the lab time.
Week 1: Foundations and Architecture (Section 1)¶
Day 1-2: Virtualization concepts and VMware portfolio¶
- Hypervisor types (Type 1 ESXi, Type 2 Workstation/Fusion)
- vSphere 8 component map (ESXi, vCenter, vDS, vSAN, NSX, Aria)
- Post-Broadcom changes: VCF, VVF, vSphere Standard, Essentials Plus
- Per-core licensing model (16-core minimum per CPU)
- Read:
notes/01-architecture-technologies.md
Day 3-4: Hardware compatibility and platform services¶
- Hardware Compatibility List (HCL) - servers, NICs, HBAs, storage
- CPU compatibility for vMotion (EVC modes, Intel/AMD baselines)
- vSphere 8 deprecations: PSC removed, VUM removed, USB-only boot deprecated
- Lab: install ESXi 8 (ISO or HOL); explore DCUI
Day 5-7: vCenter, ESXi, and vDS introduction¶
- VCSA architecture (PostgreSQL embedded, no Windows option)
- vCenter SSO domain (default
vsphere.local) - Enhanced Linked Mode (ELM) for multi-vCenter
- Lab: deploy VCSA in Tiny size into your ESXi host
- Read:
notes/02-vmware-solution.mdfirst half
Week 2: VMware Solution Components (Section 2)¶
Day 8-10: Networking - vSwitch and vDS¶
- Standard vSwitch (VSS) layout, port groups, VMkernel ports
- vDS architecture, distributed port groups, uplink port groups
- Teaming and failover policies (port ID, IP hash, LBT)
- LACPv2 on vDS
- NIOC (Network I/O Control) v3 reservations and shares
- Lab: create vDS, migrate VMkernel from VSS to vDS
Day 11-13: Storage - VMFS, NFS, vSAN, vVols¶
- VMFS-5 vs VMFS-6 (automatic UNMAP, 4Kn)
- iSCSI software initiator, dynamic vs static discovery
- NFS v3 vs v4.1 (Kerberos, session trunking)
- vSAN OSA (cache + capacity disk groups) vs ESA (storage pool)
- vVols and VASA provider concept
- Lab: add iSCSI software adapter, mount NFS datastore
Day 14: Cluster services - HA, DRS, FT¶
- HA failover, master/slave election, datastore heartbeats
- HA admission control policies (Cluster resource percentage default)
- DRS automation modes and migration threshold
- FT lockstep secondary VM, vSphere 8 limits (8 vCPU, 128 GB)
- Read:
notes/02-vmware-solution.mdsecond half
Week 3: Installation and Configuration (Section 4 part 1)¶
Day 15-17: ESXi installation¶
- Interactive install from ISO
- Scripted install (kickstart
ks.cfg) - Auto Deploy (PXE + image profiles)
- vLCM image-based cluster deployment
- DCUI navigation, initial host networking, root password
- Lab: install ESXi via interactive installer; rebuild via kickstart
- Read:
notes/03-installation-configuration.mdfirst third
Day 18-19: vCenter Server Appliance (VCSA) deployment¶
- Stage 1 (deploy OVA), Stage 2 (configure SSO/network)
- Sizing: Tiny / Small / Medium / Large / X-Large
- Embedded PostgreSQL, file-based backup
- vCenter HA (active/passive/witness) - basic concept
- Lab: redeploy VCSA in Small size to a different cluster
Day 20-21: Datacenter and cluster setup¶
- Create datacenter, cluster, add hosts
- Enable vSphere HA on cluster
- Enable DRS, choose automation level
- Configure EVC mode for cluster
- Lab: build a 3-host nested cluster, enable HA + DRS
Week 4: Installation and Configuration (Section 4 part 2)¶
Day 22-24: Networking configuration¶
- Build VSS, add port groups, assign uplinks
- Create vDS, add hosts, migrate VMkernel adapters
- Configure VLAN tagging (VST), private VLANs (vDS only)
- vMotion network design, dedicated VMkernel
- Lab: create vDS, add 3 hosts, create port groups for management/vMotion/VM traffic
Day 25-27: Storage configuration¶
- Create VMFS datastore, expand vs grow, multipathing (NMP, PSP)
- Software iSCSI adapter, target binding, dynamic discovery
- NFS mount and unmount, AUTH_SYS vs Kerberos
- Storage policies, VM Storage Policy assignment
- vSAN: claim disks, create disk groups, enable services
- Lab: create VMFS-6 datastore, mount NFS, build a 3-node vSAN cluster
- Read:
notes/03-installation-configuration.mdmiddle third
Day 28: Virtual machine creation¶
- Create VM from scratch (HW version, BIOS vs EFI, VMware Tools)
- OVF/OVA deploy
- Clone, template, customization specifications
- Content Library upload and deploy
- Lab: create Linux VM, install Tools, convert to template, deploy 3 clones
Week 5: Performance and Optimization (Section 5)¶
Day 29-30: Resource management¶
- Resource pools: shares, limits, reservations
- Expandable reservations
- Memory overcommit techniques: page sharing, ballooning, compression, swapping
- Storage I/O Control (SIOC), Network I/O Control (NIOC)
- Read:
notes/04-performance-optimization-upgrades.mdfirst half
Day 31-33: vMotion / DRS / Storage DRS tuning¶
- vMotion network sizing (1 GbE 4-vMotion, 10 GbE 8-vMotion)
- Long Distance vMotion (150 ms RTT, 250 Mbps)
- Encrypted vMotion modes
- DRS migration threshold tuning
- Predictive DRS with Aria Operations
- Storage DRS (SDRS) clusters, IO metric inclusion
- Lab: vMotion a VM, Storage vMotion to a different datastore
Day 34-35: Lifecycle Manager and upgrades¶
- vLCM baseline mode (legacy) vs image mode
- Cluster image: ESXi base image + vendor add-on + components + firmware (HSM)
- Stage / remediate workflow
- Upgrade path: 7.0 β 8.0 (no direct from 6.7; 6.7 must go to 7.0 first)
- Lab: stage and remediate a host with vLCM in image mode
- Read:
notes/04-performance-optimization-upgrades.mdsecond half
Week 6: Troubleshooting (Section 6)¶
Day 36-38: Logs and triage tools¶
- vmkernel.log, hostd.log, vpxa.log, vpxd.log, fdm.log, vmware.log per VM
- vm-support bundle generation
- esxtop counters: %RDY, %CSTP, DAVG, KAVG, GAVG, %SWP, %MCTL
- esxcli storage / network / vsan diagnostic commands
- Read:
notes/05-troubleshooting-repairing.mdfirst half
Day 39-40: Common failure modes¶
- APD vs PDL behavior, HA reactions
- vMotion failures (CPU mismatch, network MTU, EVC)
- HA isolation response (Disabled / Power off / Shut down)
- DRS migration failed (anti-affinity, host pinning, resource shortage)
- vSAN: degraded vs absent components, resync
Day 41-42: VM and host repair workflows¶
- VM restart on isolated host (HA action)
- Host disconnected: vpxa restart, services.sh restart on host
- Datastore unmount errors (active VM, locked file)
- vCenter unable to manage host: agent reset
- Lab: simulate APD by disabling iSCSI target, watch HA behavior
- Read:
notes/05-troubleshooting-repairing.mdsecond half
Week 7: Administrative and Operational Tasks (Section 7)¶
Day 43-45: VM lifecycle¶
- Power operations (power on, power off, suspend, reset)
- Snapshot create / consolidate / revert / delete
- Snapshot disk types (delta, sesparse, vsanSparse)
- Snapshot best practices (max 32 in chain, but operational target <3, <72h)
- Clone vs template, customization specs
- Lab: take snapshots, revert, consolidate; clone with customization spec
Day 46-47: Permissions, roles, identity¶
- vCenter SSO domain
vsphere.local, identity sources - Built-in roles: No access, Read-only, Administrator
- Custom role creation, privilege selection
- Permission inheritance and override at child objects
- Global vs vCenter-scoped permissions
- Federated identity with AD FS / Okta / Entra ID
- Read:
notes/06-administrative-operational-tasks.md
Day 48-49: Content Library, tags, categories¶
- Local library, published library, subscribed library
- Subscribed-on-demand vs subscribed-immediate
- Cross-vCenter content sharing
- Tag categories and cardinality
- Tag-based VM Storage Policies
- Lab: create local content library, publish, subscribe from second vCenter
Week 8: Practice Exams and Final Review¶
Day 50-52: Full practice exams¶
- Take a full 70-question practice exam (target: 70%+)
- Identify weak sections from results
- Re-read notes for the weakest two sections
- Take a second full practice exam (target: 75%+)
Day 53-54: Maximums and recall drilling¶
- Drill the configuration maximums table from
fact-sheet.mduntil automatic - Drill the VCSA sizing table
- Drill the license bundle contents (VCF vs VVF)
- Drill the esxtop counters and thresholds
Day 55-56: Final exam preparation¶
- Skim every notes file
- Re-read fact-sheet.md and strategy.md
- Take a third practice exam (target: 80%+)
- Review every wrong answer; understand why
Exam Day¶
- Verify ID and exam appointment
- Review configuration maximums one more time
- Read each question fully; flag uncertain ones (you can return)
- Use the full 135 minutes if needed
- Trust your hands-on time
Daily Study Routine (1.5-2 hours/day)¶
Recommended Schedule¶
- 15 minutes: Review yesterday's notes
- 45 minutes: New material from notes file
- 30 minutes: Hands-on lab practicing what you read
- 15 minutes: Practice questions on the day's topic
Practice Exam Strategy¶
Target Scores by Week¶
- Week 4: 60%+ on section-specific questions
- Week 5: 65%+ on mixed practice
- Week 6: 70%+ on mixed practice
- Week 7: 75%+ on full-length practice exams
- Week 8: 80%+ consistently before scheduling the real exam
Study Resources¶
Free¶
- VMware Hands-On Labs - free browser-based vSphere environments
- VMware Configuration Maximums Tool - authoritative maximums
- VMware Compatibility Guide - HCL
- VMware Docs - vSphere 8 - official docs
- William Lam's blog (williamlam.com) - automation, nested ESXi tips
- Yellow Bricks (yellow-bricks.com) - Duncan Epping (HA/DRS book author)
Paid¶
- VMUG Advantage ($200/year) - EVALExperience licenses for vSphere 8 Enterprise Plus, vSAN, NSX
- Pluralsight VCP-DCV path - video course covering exam blueprint
- Hands-on Lab subscriptions (Pluralsight, INE, CBT Nuggets)
- VMware Learning Zone / Broadcom Learning - official course recordings
- VMware vSphere 8 Cookbook by Abhilash GB - reference book
Final Exam Checklist¶
Content Preparation¶
- All six notes files reviewed at least twice
- Fact sheet maximums and esxtop counters memorized
- License bundles (VCF vs VVF) memorized
- Logs by component memorized
- vSAN OSA vs ESA differences clear
- HA, DRS, FT defaults memorized
Logistics¶
- Authorized training course completed (first-time VCPs only)
- Pearson VUE account set up
- Exam scheduled at least 1 week out
- Valid ID ready
- Testing environment cleared if online proctoring (no second screens, clean desk)
Exam Day Strategy¶
- Time management: 70 questions in 135 minutes = ~115 sec each (very comfortable)
- Read every option before selecting
- Flag uncertain questions and use the review screen at the end
- Watch for "by default" wording in scenarios
- Reject any answer mentioning VUM, PSC, or external Windows vCenter